Show simple item record

dc.contributor.authorVan Den Hende, Karel
dc.contributor.authorLombaert, Geert
dc.contributor.authorMatthys, Stijn
dc.contributor.authorBotte, Wouter
dc.contributor.authorICASP14
dc.contributor.authorHelderweirt, Stef
dc.contributor.authorCaspeele, Robby
dc.date.accessioned2023-08-03T13:26:34Z
dc.date.available2023-08-03T13:26:34Z
dc.date.issued2023
dc.identifier.citationKarel Van Den Hende, Stef Helderweirt, Wouter Botte, Stijn Matthys, Geert Lombaert, Robby Caspeele, Time-Dependent Reliability Calculations Approximated by a Lower and Upper Bound Method to Determine Time-To-Failure Curve for Optimization of Interventions, 14th International Conference on Applications of Statistics and Probability in Civil Engineering (ICASP14), Dublin, Ireland, 2023.
dc.identifier.urihttp://hdl.handle.net/2262/103294
dc.descriptionPUBLISHED
dc.description.abstractThe optimization of the timing of repair interventions on civil engineering structures is ideally based on the minimization of the total life-cycle cost. An important part of the total life-cycle cost is the expected failure cost, which can be calculated based on the lifetime function describing the probability density of the time-to-failure. However, for deteriorating structures, the determination of the lifetime function is not straightforward as it requires solving a time-dependent reliability problem. This can be computationally expensive for more complex structures and hence a challenge for the optimization algorithm that is searching for the optimal maintenance strategy. To overcome this problem, the probability of failure for time-dependent reliability problems can be approximated by time-independent lower and upper bounds that are much easier to quantify. In this work, it is investigated whether the proposed maintenance strategy changes significantly if the bounds are used instead of the more exact and numerically more expensive solution. The results show that the lower bound approach is generally a better option than the upper bound approach to achieve a close-to-optimal solution.
dc.language.isoen
dc.relation.ispartofseries14th International Conference on Applications of Statistics and Probability in Civil Engineering(ICASP14)
dc.rightsY
dc.titleTime-Dependent Reliability Calculations Approximated by a Lower and Upper Bound Method to Determine Time-To-Failure Curve for Optimization of Interventions
dc.title.alternative14th International Conference on Applications of Statistics and Probability in Civil Engineering(ICASP14)
dc.typeConference Paper
dc.type.supercollectionscholarly_publications
dc.type.supercollectionrefereed_publications
dc.rights.ecaccessrightsopenAccess


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

  • ICASP14
    14th International Conference on Application of Statistics and Probability in Civil Engineering

Show simple item record